Photo by Visitor7

Tired of that super long trip on transit between Westwood and Downtown LA?

Well, how does 25 minutes sound?

The Purple Line Extension will add nine miles of track between its current endpoint at Wilshire/Western in Koreatown and the Westwood area. And it may just be hitting the streets 10 years before its initial target date! As projected by the draft spending plan, this new rail line will be in service between 2024 and 2027.

The following Metro stations will be built:

  • Wilshire/La Brea
  • Wilshire/Fairfax
  • Wilshire/La Cienega
  • Wilshire/Rodeo
  • Century City/Constellation
  • Westwood/UCLA
  • Westwood/VA Hospital

The Westwood/UCLA stop, which will be located at the intersection of Wilshire and Westwood, plants you 1.1 miles away from the heart of campus. The Westwood/VA Hospital Station will be located in front of the Veteran Administration’s West Los Angeles Medical Center.

Plus, think of all the places you'll be able to venture to along the Purple Line Extension. Hop off the Wilshire/La Brea Station and visit the La Brea Tar Pits, or step off Wilshire/Fairfax and cross the street to LACMA. The Wilshire/Fairfax stop is about a mile from the Farmers Market and the Grove, and the Wilshire/La Cienega Station is 0.75 miles from the Beverly Center and Cedars Sinai Medical Center.

Imagine what your commute could look like when this project is finally completed. So just sit tight: It might even be done before 2024 if UCLA is picked to host the 2024 Summer Olympics!subwaymap