Two 10-hour directional I-405 freeway closures will be required on the weekends leading up to Carmageddon II (September 29-30).

Directional freeway closures are necessary for the contractor to completely remove temporary bridge supports over the center of the freeway without creating a safety risk to passing motorists.

Please take note of the closures in the chart below.

Closure Schedule
Southbound: Directional full freeway closure between U.S. 101 freeway to the Getty Center Dr. ramps;southbound U.S. 101 and northbound U.S. 101 to southbound I-405 connector ramps Saturday, Sept. 8, at 11 p.m. to Sunday, Sept. 9, at 9 a.m.
Northbound:Directional full freeway closure between the Getty Center Dr. ramps to the Ventura off-ramp;southbound U.S. 101 and northbound U.S. 101 to southbound I-405 connector ramps Saturday, Sept. 15, at 11 p.m. to Sunday, Sept. 16, at 9 a.m.
Mulholland Bridge Closure Friday, Sept. 14, at 10 p.m. to Sunday, Sept. 16, at 8 a.m.
Mulholland Drive, from the west side of the bridge to Casiano Road Friday, Sept. 21, at 10 p.m. to Monday, Sept. 24, at 6 a.m.

Remember to plan ahead, avoid the area or eat, shop and play locally!

Read the news release on Metro’s website.